欧美色老大,亚洲黄综合,无遮挡免费网站,中文字幕一区二区在线网站

文章詳情

i1000d U9401

日期:2025-07-02 03:40
瀏覽次數(shù):2155
摘要:

i1000d U9401
Before you begin installation, prepare the power cable for the system.
Refer to the instructions
incontinue with the installation procedure for your system:
. Installation Procedure for Press Down Model (U940IA)
~ Installation procedure for Vacuum Model (U9402A)
Installation Procedure for Press Down Model (U940IA)
1  Install the Press Down Unit (U940IA)
2  Install the Controller
3  Connect the Debug Probe
4 Connect Power and Compressed Air Supply
5 Power Up the System
6  Install Medalist il000 Software
7  Install the Fixture
8 Align the Safety Sensors
9  Perform a System Check
Installation procedure for Vacuum Model (U9402A)
1  Install the Controller
2 Connect the Debug Probe
3 Connect Power and Compressed Air Supply
4 Power Up the System
5  Install Medalist il000 Software
6  Install the Fixture
7  Perform a System Check
Medallist  i1000  InStalia~tion  Guzde
Preparing the Power Cord

The Medalist il000 is shipped without a power cord. This allows local support
engineers to purchase a power cord that is suitable for use in the facility
where the system is installed and meets the regulatory requirements of the
country.
Be sure to purchase a power cord rated to operate at 200~240 VAC and
10 Amps, with a minimum length of 2.5 m.
To assemble the power cord, follow these steps:
1    Locate  the  power  connector  provided fFigur e  8)
Figure 8   Power connector
2 Loosen the two screws holding the cable retainer at the back of the
   power connector. Then unscrew the black connector insert to separate
    it from the metal casing(fg_:-o :-.).
Figure 9   Remove black connector insert
Medealist i1000  Instaallation  G uidp
3 Strip the insulation
power cord through
(Figure 10).
of the power cord to expose the wires. Insert the
the metal casing of the power connector
Figure 10   Strip power cord and insert in connector
4  Solder the wires to the correct terminals on the connector insert. The
   terminals are  numbered as  shown in "Fi;-:-1■.re  1 11-.
Ensure the wires are connected to the correct terminals as shown in
            .. Otherwise the system could be damaged.
Figure 11   Solder wires to terminals
Me d allist  il 000  InStaliation  Guade
i1000d U9401
 

天堂综合一区在线| 国产精品国产中国久久| 青草av在线播放| 免费高清AV一区二区三区| 久久久久久免费影院精品不卡| 亚洲一区二区国产精品久久| 国产搞搞精品| 国产精品无码一区二区三区久久| 预约激情六月丁香| WWW.超碰香蕉| 日韩不卡一区二区三区| 国产精品久久久久不卡无毒| 靖江市| 久热经典视频在线观看| 亚洲v无码一二三四区| 婷婷五月天啪啪| 在线观看视频一区二区| 91视频密臀| 孕妇裸体孕交免费看| 国产精品另类激情免费| 日韩视频第七页| 日本夜爽爽一二区| 亚洲VA无码VA在线VA天堂 | 久久久久成人亚洲国产av无码综合精品 | 人妻斬在线播放网站| AⅤ不卡在线观看| 国产精品一区第二页在线| 欧美日韩美熟女性爱| 欧美国产一区二区三区激情无套| 国产av自拍一区| 香港精品一二三区| 无码中文字幕在线不卡免费| 久久国产老子精品无码| 神马不卡三级| 人人妻人人澡人人爽欧美一区九九| 岛国精品一区二区三区| 色亭亭六月| 无码人妻无码| 黑人巨大精品欧美一区二区,| 扎囊县| 亚洲综合第色AV|